Frequently Asked Questions

Home-Frequently Asked Questions
Generally councils can have different rules regarding construction. If you are located in a suburban area, a structure of more than 10 square meters may require council approval. All of our sheds are supplied with the appropriate engineers certificate and drawings. For more information on this, please contact our office or call your local council.
  • ShedFast Frames have a 10 Year Structural Warranty
  • Colorbond® Roofing has a 10 Warranty
  • For ground anchoring, use the ShedFast Ground Peg Anchor Kit.
  • For concrete slab installation, use the ShedFast Slab Anchor Kit or suitable ChemSetTM.
  • For concrete pier installation, use the ShedFast Pier Anchor Kit or suitable ChemSetTM.
Yes, just include a ShedFast Gutter Kit at time of order and simply allow suitable fall from one end of your shed to the other when installing. We replace the flashing from the gutter end of the shed and in turn extend the roof sheets 50mm to provide overhang into the gutter. The ShedFast Gutter Kit is custom made to suit your shed rafters and us easy to install. You then connect your down pipes as required.

Please note; this must be stipulated at time of order to ensure that the roof sheets are cut to length.

Yes! All ShedFast frames are manufactured from Australian Galvanised Steel. Any welded parts are hot-dipped Galvanised as standard, for maximum protection. We can arrange hot-dipped galvanising of your ShedFast frame, however, this would come at an additional cost. Please contact us for pricing.
All ShedFast frames are APT-Gal silver. The roofing sheets are Colorbond®, we have their full range available which can be viewed on this page of our website.
All ShedFast frames are heavy duty and are manufactured using 75 x 50 x 2.0mm Australian ATP-Gal RHS steel. In some cases, the ShedFast frame is up to 30% stronger than alternative options on the market. This combined with the hot-dipped galvanised protection makes ShedFast the number one choice for strength and longevity.
We deliver Australia wide. All products can be flat packed for transport purposes, and come with easy to follow assembly instructions.
ShedFast relocatable sheds are engineered as an open structure. However, our sheds can be fitted with extra wall sheets and an enclosed rear wall option is available. For customised sizes, please contact our office.
Payment terms are 10% deposit upon acceptance of quote and the balance is payable prior to shipping. We accept cash, cheques, EFTPOS, credit cards* and direct deposit. (*surcharge applies)
To obtain a quote for any ShedFast product, please get in touch with us via our online contact form on this page. Once the online inquiry is submitted, you will receive an answer within 24 hours. Alternatively, contact us via phone on 1300 138 000, or contact Mark directly on 0409 028 972.

Yes, but it is important to do the following; your shed pack should be disassembled and all parts check on delivery. Due to natural occurring oxidization between galvanized surfaces it is important you store your shed parts off the ground in a dry place, with air gaps between pieces. Your roofing material should also be stored in a dry place while in a pack, this will help prevent any water damage to the colour caused by a reaction between the sheets. It should be noted that when the shed frame and roof sheets are stored with air gaps between them naturally occurring reactions between surfaces is prevented.